Tuesday, January 21, 2014

Binding is on

I got the binding machine sewn on the other music quilt last evening and I also did my sewn mitered corners. I got up this morning and before I went to work I trimmed the excess backing and batting, pressed the binding, and got one of the four sides hand stitched down.

I will have the rest of the binding hand sewn on tonight and hopefully have enough time to make the labels for both quilts.

Monday, January 20, 2014

1st finish of 2014

Here it is finally! My first finish of 2014.

I did do a bit more detailed quilting on this piece so the back would not be so boring.

I will get a label on it and get it shipped to the parents. My brother will not have time to take care of mailing it which would mean I would have to ship it to Los Angles and then he would mail it to its final location. Since he is headed to South Africa this week for a 6 week tour with Bruce, I will take care of the mailing. They are also going to Australia and New Zealand.

He did send me a picture of the baby on the quilt that was my last finish for 2013. Too cute!

I did get the other music quilt quilted also. I will work on the binding tonight.

Friday, January 17, 2014

Progress on the music quilt and toasted chick peas

The music quilt is coming along nicely. I am over half done and it will be done this weekend. Maybe I will have enough time to start on the other music quilt.

Yesterday I found a recipe for toasted chick peas to for a healthy snack. I had chick peas in the cupboard so I tried it out. The receipe is on http://www.alisaburke.blogspot.com. After the peas were done I just sprinkled a little salt and paprika on them. They are nice and crispy out of the oven. I let them cool and put them in a storage container. This morning I tried them and they did lose the crispness, but they were still tasty. So easy to make: drain peas, lay on a paper towel to get any excess moisture, mix the peas with a little olive oil, spread on a baking sheet and toast for 15 minutes or so at 400 degrees. I put mine in for 10 minutes then tossed them around a bit and continued to toast. When they are hot out of the oven sprinkle with any seasonings or herbs you want.

Life is starting to get busy for me. I needed a way to keep me on track so I found a small three ring binder. In it I have my calendar and to do list. Then I also have information for projects I am involved in. I have a horrible habit of writing stuff on random pieces of paper then losing those papers and missing dates.

I did get news that the art museum is still going to sponsor me teaching an improvisational piecing workshop in February! We are working out the details for the workshop requirements. The museum is launch a new website and the workshop will be on it plus they will do an email blast. I am excited about this and I need to put my nose to the grid stone to get prepared for this.

Have a great weekend!

Thursday, January 16, 2014

Progress on two fronts

Here is where I am at on the baby quilt. I finished quilting the upper part, quilted the red and white triangles with line quilting, and got started on quilting the lower part of the piece. I should have this done this weekend.
Here is a shot of the back so you can see the triangles. I like the extra detail and interest this adds.

The second front - the new garage door opener had been installed! I am so happy!!! The fellow, Tim, was upset at what a horrible job the person did when the old opener was installed years ago. The bracket holding the rail (that the part the chain runs along from the motor) had only one bolt holding it to the wall - there needs to be two - and the bold was not tight. I guess that is why the rail would flex so much when I opened the door! And then the one spring had no tension on it at all so the door would not stay open as far up as it should. It took about an hour and 45 minutes to get the work done. I helped by holding a trouble light, cleaning up the empty boxes and packaging, and handing Tim tools. He thanked me for having such a clean garage. He had just come from a job where he replaced the opener and the door and the garage was full of junk that was in his way. Here are the springs I am talking about.

He said the old opener was a piece of junk even when it was installed - a very cheap opener. So here it is on the floor.

And here is my new one. I now have sensors so if the door is coming down and you walk under the door, the door will stop. My old one didn't have that. So when I sell this place to a family some day, that will be a good safety feature for them.

I am very happy camper!

Wednesday, January 15, 2014

Progress on the quilt and the garage

When I got home after work I changed my clothes and headed back to the garage. Why? Because the fellow is coming today to install the new lift system for my garage door - yeah! I wanted to get all the stuff cleared out where the current wiring is for the hard wired opener so the fellow wouldn't have to move anything. So here you can see the right side is all cleared out except for stuff I can't move.

Then I decided to clean the garage door interior. There are these 2" deep ribs on the doors and they were black with dirt, grime, and greasy spots. I used some Simple Green and it cleaned the door up. Here is the after - I forgot to take the before, but you all probably know what more than 10 years of dirt looks like.

Last thing I did outside was to take out the recycling bin. It was 6:15 p.m. and look at the moon! I don't know if that is a star or a planet to the left of the moon - ignore the spot of dust that was on the lens - but the moon was beautiful!

Then I noticed that even with the arctic weather last week, the little bit of sunshine we had has sent up shoots on daffodils and daylilies. I hate to tell them that it is suppose to snow this week.

I did get a little bit of quilting done on the musical quilt. Here is a shot of the back and you can see I only have a small area to finish quilting in this section.

Maybe one of my readers can help me. I need a easy pattern for a knitted infinity scarf. Thanks!

Tuesday, January 14, 2014

Progess quilting and making soup

I got my bobbins wound and started quilting one of the music baby quilts. Here is a look

Last evening I put together a big pot of vegetable beef soup. I had cooked the chuck roast in water on Sunday and had the broth in the fridge so I could skim off any fat. So the broth, shredded beef, pureed tomatoes, celery, green beans, carrots, yellow wax beans, cauliflower, chopped broccoli, kale, and spinach went in the pot to simmer. I added some Wochershire (you know that Lee and Perins stuff - I can't spell this morning!)sauce, salt and pepper too. The house smelled divine! I put some in the freezer and will get quite a few meals out of this.

The mailman brought me my new Yak Trax. I bought a bigger pair than the pair I had that were given to me. I will be ready for the next snow storm! Right now it is 36 degree and overcast. We have had a lot of rain the last couple of days.

The mailman also brought me some fabric. I found more of that red drum fabric on esty so I bought 3 yards. Then I found this other drum fabric and they had 1 yard and 8". Even with shipping they were both reasonably priced. I am trying not to buy fabric unless I can truly justify it. Fabric with drums on it - I need.


Monday, January 13, 2014

Pin basted and ready for quilting

I wasn't that ambitious this weekend but I did managed to get a little cleaning done and the top pieced for the red triangle quilt. It is now pin basted and ready for quilting.

I used that gold/tan fabric for the back of this one.

I had the fractured log cabin piece almost pin basted, but I got a phone call for some unexpected company so I stopped what I was doing to pick up a bit before they arrived. I only have a few more pins to add and it will be ready for quilting.

For the back I went thru my black and white fabrics to see if I had anything that would look good and I found this circle fabric.

I have the bindings for these two quilt cut also. At lunch today I think I will get some bobbins wound and get the machine set up for free motion quilting. I am going to do my all over pattern on these rather than line quilting especially since the pieces are so small on the triangle quilt, but on the triangle quilt I plan on line quilting the red triangles and maybe the adjoining white ones just to add a little detail.