Saturday, July 12, 2025

Log cabin quilt progress

I got to work pin basting the log cabin quilt as soon as I got home from work. We closed the office a bit early because it was very warm in the office. We haven't had A/C for two weeks now and it was 82. If the part comes in, it should get fixed next week. Anyway, I got the quilt bin basted and have 7% of the quilting done.
I was having problems with the bobbin thread coming out of the bobbin slot. I oiled the bobbin casing, changed the needle, and as a last resort tightened the bobbin case screw just a tiny bit. We will see it the quilting goes smoother today.

4 comments:

Exuberantcolor/Wanda S Hanson said...

That is the pits having A/C going out during a hot spell. I'm glad you could leave early. I hope you were able to correct the bobbin problem. I wonder if new bobbin cases are still available for our old machines.

Exuberantcolor/Wanda S Hanson said...

It's the pits having A/C go out in a heat spell.
I hope you solved the bobbin case problem. I wonder if new bobbin cases are still available for our old machines. I already have an extra I bought 20 years ago.

Cherie Moore said...

82?!?! Whew, I wouldn’t be able to work in heat like that……I’d be dripping sweat all over everything! The log cabin is quilting up beautifully:)

Vicki W said...

You are moving right along with this quilt!