Wednesday, January 22, 2025
A bit more progress on the t-shirt quilt
I got another shirt quilted so now I am 44% done with the quilting. It will be exciting to get to 50%.
It is -9 degrees here this morning. I have a frozen pipe in my downstairs bathroom which doesn't suprise me. I have a space heater running to try and get it thawed out and prevent the cold water line from freezing. The pipes run along an outside wall; yes, a poor design.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment