Monday, August 4, 2025
Homespun quilt progress and mowing
The homespun quilt is now 90% quilted. Yes, I spent a lot of time this weekend FM quilting. I outlined the area the is left to be quilted.
I have gone thru four spools of thread and started on the fifth.
I worked on straightening up the fabric storage room and the guest bedroom. I had a lot of fabric piled up on the beds in the guest room so I needed to get that moved to the fabric storage room. While straightening up the closet in the guest room, I found two baby quilts!
On Sunday I worked on mowing and trimming the back yard. I had mowed the front on Saturday. The back was a mess! It has been 6 - 8 weeks since I had mowed it; lots of excuses! Too hot. Too wet. No time. It took 26 trips back and forth to get the mowing done. I dumped the mower bag 13 times; that's how I know it took 26 trips.
The grass/weeds had to be at least 6" tall. I am so glad the back is mowed. I still have some trimming I need to do, but the worst of it is done for now. Here you can see the first two passes.
A quick trip to the grocery store, some laundry, and a bit of weeding rounded out my weekend.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment