Monday, February 9, 2026
T-shirt quilt progress and the green baby quilt top
I am still not feeling great, but I did manage to get some work done. The T-shirt quilt is now 83% quilted. I outlined the shirts that still need quilted.
All of the green strips have been sewn and cut to size. The blocks are now arranged on the design wall. I changed out the fabric for the final row at the top from a very bold print to something more subtle.
I have more than enough blocks left over to make another baby quilt.
I ended up with a stack of the end pieces that I will sew together and make 4-patches out of them.
My goal this week is to get the quilting done on the t-shirt quilt, get it bound, and mailed.
Subscribe to:
Post Comments (Atom)




3 comments:
Gosh, you’ve been fighting this round of icky for a while…..sorry you’re not all better yet. Almost finished with the quilt…..won’t be long now. The zig zag quilt looks great! And one quilt begets two more….😉
That's a lot of progress. Only a few more days......
I like the green zig zag.
Love that zig zag!!!
Post a Comment