Monday, December 6, 2021
Updating the List!
Here is an update to my to-do list I posted a week ago on Nov. 29th.  I made some progress!  1. plateform cover - DONE! Yeah!  It will be shipping today.
Here it what it looked like at the sewing machine as I was sewing on the edging with the velco.
and here it is on my big table.  It was a challenge to fold it and get it into a box.  The material is a heavyweight vinyl coated material and the cover measures 99" across.
2. Dark flannel quilt.  I have it 59% quilted.  I ran thru 25 bobbins yesterday!  I was at 18%.
3. baby quilt for my niece. DONE!
4. stocking - DONE!
5. pastel flannel quilt - made progress.  I got the rest of the strips I needed for making blocks sewn, pressed, and cut into units for 9 patch blocks.  I still have more strips to sew together, but I will do that later.  I have the cut pieces paired up and ready to take to work for sewing them at lunchtime.  No sewing today though; have a doctor's appointment which will wipe out my lunchtime.
So here is my updated list.  I am looking at trying to get done the first four items by Xmas.
Subscribe to:
Post Comments (Atom)
 
 
No comments:
Post a Comment