Tuesday, December 21, 2021
19th finish for 2021
Yeah rah!  I got the pastel flannel quilt done!  It's the same size as the dark flannel quilt.  
I then started on another Xmas gift.  I was given a bag of ties to make a pillow out of.  There were plenty to make three small pillows, but for now I am making two.  I first laid out these on a base, but wasn't thrilled with the look.
So then I changed them around and like this better.
The other colorway was the gray ties.  Here I have them attached to the base using an embroidery stitch on my machine.  I just butted them next to each other.  I used a rayon Sulky thread.
I trimmed them to size and to make construction easier, I rounded the corner.
I made the pillow inserts out of some fabric that was given to me.  I will stuff those at lunch time today.  Tonight after work I will make the backs and sew them together then that job will be done!
The only other project I had planned for Xmas for gifts was to turn these two cross stitch pieces into pillows.  I will have to get more fiberfill for stuffing and it just depends on if I can find the time between now and Christmas Eve to make these.  I still have pies and cookies to bake.
Subscribe to:
Post Comments (Atom)
 
 
4 comments:
You are so on track to get 21 finishes in 2021. Good for you, Patty! I'm going to have to follow your lead and see if I can set a goal of 22 finishes in 2022. I have a lot of quilts getting to the just right stage for finishing that I could finish a bunch.
I love your cross stitch projects. You are really making great progress with them. Your quilting on the quilt is perfect again. Lovely work.
Cookie making starts on Wednesday here. I have two days to sew. Woohoo!
Wow love the pastel. You have some great pieces going!
The quilt looks great! You still have a lot to get done. Can you take another vacation day?
Like the ties, wish I had thought to do that before giving my husband's tie collection away!
It's a really good idea and looks great.
Post a Comment