Another bit of progress on the t-shirt quilt.  It took me 2 hours to quilt this Girl Scout scarf!  Lots of detailed quilting around each one of the symbols and the lettering.  I had to take it slow and easy to make sure I kept the fabric smooth and taunt.  
Then I quilted this little filler piece.
Here is my tip of the day when quilting t-shirts quilts.  For each shirt I detail quilt around the design first then meander quilt the background as I can.  Say for instance there is wording 2 or 3 inches down from the top of the block.  I would quilt around those letters and then meander stitch the space between the letters and the top edge.  Next I would work my way down to the next area that needed detailed stitching and quilt that.  I found that if I meander the background first then do the detailed stitching, it is harder to work in any excess.  
I am now 40% done with the quilting!  This is for the daughter of a lady I work with for the daughter's graduation so she doesn't need it until May, but I plan on having it done in the next two weeks.  I want to  try and get as much as I can done on the quilt this weekend between all the other things weekends usually entail.  It is suppose to be in the 50's on Sunday so if nothing else I will have to wash my car.  It is so dirty with all the dust from the job site. 
Have a great weekend!  
Friday, February 21, 2020
Subscribe to:
Post Comments (Atom)
2 comments:
Hope you had a very productive weekend!
You are well ahead of the game with this - plenty of time for car washing. :-)
Post a Comment