I survived day one in the non air conditioned construction zone.  It had to have been between 85 and 90.  I have my own box fan and it keeps the air moving, but it blows my papers around and draws the dirt in my direction.  I just feel dirty all day long.  It is not suppose to be as hot today and we have a pre-install meeting in an AIR CCONDITIONED ROOM so even though the meeting will be boring, I will at least be cool.  Another thing I have to do is wear ear plugs all day long.  The noise of them cutting metal studs with a chop saw is deafening.  Just them dropping the studs on the floor rattles my teeth.  By the end of the day my ears hurt from the ear plugs.  
I was beat when I got home, but took the beef and water I had in the crock pot all day, transferred it to a pot on the stove, and made vegetable soup.  I had some for breakfast and it was really good!
This morning I was up early and had time to sew together one of the equipment covers I had cut out a few weeks ago.  This one is for the keyboard player's amp.  I know it doesn't look like much so I will try to get a picture of it on the amp.
Tuesday, July 17, 2018
Subscribe to:
Post Comments (Atom)
 
 
1 comment:
Sewing before work shows real dedication.
Post a Comment