I worked all day Saturday on going thru my stash and making more FQ's and some half yard pieces.  Here is the box of FQ's and the 1/2 yard box is now overflowing.
Sunday I quilted on the Halloween quilt.  I got 5 more blocks quilted and worked on the quilting the border also.
As I was quilting thoughts of what I needed to get done bounced around in my head.  I need to get this quilt done by Oct. 31, BUT I need to get two smaller quilts done by early October so I needed to switch gears and start on those two smaller quilts.  The first will be made with Yo Gabba Gabba fabric.  This is the progress made.  I like the way this quilt looks despite the goofy fabric.
The other quilt will be made with Elmo fabric.  I dug thru the stash and found some tone on tone fabrics and some polka dot fabrics I will add into the mix.
Monday, August 26, 2013
Subscribe to:
Post Comments (Atom)
 
 
1 comment:
Glad your to do list has quilting projects instead of house projects!
Post a Comment