Between Saturday and Sunday I put in at least 18 hours of quilting on the music quilt. I am now 88% done with the quilting. This picture shows the areas outlined in green that still need quilted.
I was jumping all over the place with the quilting. I quilted all the black areas then would jump to white thread for awhile. Next I would switch over to off white so there was no rhyme or reason for what got quilted.
I did good in February getting 4 items on my to do/UFO list completed.
The Harley quilt
The Amish style small quilt which was part of the lot of quilts I gave to my co-workes church
Red crazy patch - another quilt that was in the giveway pile
and the tropical print quilt
That was a very productive month. Congratulations! Your UFO list must surely be getting much smaller!
ReplyDeleteYou are really getting arm and shoulder exercise with all of the machine quilting. Your first March finish is almost there.
ReplyDeleteYes. A productive month. Doesn't it feel good to get some older quilts out of the way and off to new homes?
ReplyDeleteThat's a good haul in this short month! You are making great progress on the music quilt too - you can't be far off the next finish already.
ReplyDeleteI hope you listened to a lot of music while you were quilting this weekend! It's going to be done very soon.
ReplyDelete