Wednesday, December 16, 2020

Scrap-a-palooza day 22 and DNP progress

I got that file broken down into smaller files and got them downloaded to the architect - whew!!! I learned a lot and what to do for a couple more jobs that I will eventually closeout. I was able to get a bit more of the scraps cut.
I headed outside in the snow - yes, the snow fell here today - for a walk before I sat down and quilted on the DNP. After I wound another 15 1/2 bobbins, I have used up the first of two cones of King Tut. There are 2000 yards per cone. If I did my calculations correctly, I will have enough to finish this quilt. I now have about 31 SF quilted so I need to get another 5 SF done tonight or I will be behind my goal of 9 SF a day.

2 comments:

  1. I hope you have an easier time next time downloading the files. It's always good to learn an alternate way to do things.

    ReplyDelete
  2. Watching you go through the scrap hins is like the Rainbow Scrap Challenge all done in one month. You are going to get so many quilts from all these parts.

    ReplyDelete