Monday, December 14, 2020
Scrap-a-palooza day 19 and 20 plus progress on the DNP quilt
I was just too tired to post yesterday so here is what I did get done on day 19.
So today I sorted scraps into piles. Here is a pile that will be cut into 3 1/2" squares, 4 1/2" x 16 1/2" pieces for chevron tops, and pieces that will end up 3" wide for making zig zag blocks.
Then I made piles of these like pieces.
Then there were some more pieces for string blocks.
I could not avoid quilting the DNP any longer so yesterday I broke down and got started. I guess I am dreading this job because this quilt is so darn big. I started free motion quilting yesterday. I made pretty good progress. I figure I have 9 days to get the quilting done and two days for binding in order to have it done for Xmas. That means I need to quilt at least 9 square feet a day! Right now I have 22 square feet quilted which means I am ahead of schedule. I figure there are 81.7 square feet to quilt! I will get a bit more done while I watch the Browns game tonight. The sooner I get it quilted the sooner I can bind it and the sooner it will be done. In this picture the quilt is folded so there is a lot more top to quilt!
You made great progress on the quilting! I think you will have it done in record time.
ReplyDeleteI think now thatyouvegotten started it will go quickly! Good luck on your goal
ReplyDeleteWow, Patty, that is great progress, and it is quite a big quilt. I'm sure you'll get it done no problem. It looks really good. Love seeing the scrap cutting project. I should do the same with the fabrics we've accumulated for our charity group. I was thinking of string blocks by colour to get us going.
ReplyDeleteAll the small moments of time add up. Before you know it you will be finished!
ReplyDelete