I need one more box of gravel rocks to finish stoning the area around the A/C condenser and then I am done hauling rocks home from work!  I will get those tomorrow morning because I was running behind this morning and didn't have time to load up the car.  I did load up the file box yesterday morning and also a wastebasket with the gravel rocks.  There must have been about 150 pounds of rocks in those two containers.
I went around and gathered some smaller flatter rocks to make a border on the left then filled in with the gravel rocks.  Here is the before and the current state
I will be glad to have this phase of my landscaping project done.  I did roll those bigger rocks closer to there final position too.  Here is where they are sitting now
I need to get this rock over to the Lenten rose bed.  It doesn't roll because it has a flat bottom.  I have a few feet to go to get it over to where those other big rock are at.
I was thinking last night while I was rolling rocks why I don't seem to get much done in the evenings then I came up with some numbers. I spend at least 12 hours a day getting ready for work, driving to work, and being at work.  Throw in 8 to 8 1/2 hours of sleep that leaves 3 1/2 to 4 hours a day for everything else - dinner, cooking, cleaning, getting ready for bed,  sitting and relaxing for a bit, and rolling rocks (LOL!!).  Work really is interfering with my sewing production.
You have saved yourself so much money and it looks fantastic!
ReplyDeleteIt looks great, I have never thought to do that to the air conditioner....don't come see me anytime, you might see that I have stolen your idea. Ya just gotta fit some sew time in there.
ReplyDeleteOh my goodness - practically every time I visit your blog I reflect on how much you seem able to squeeze into one day.
ReplyDelete