I now have 82% of the denim quilt quilted. All I have left to do is the bottom left area.
I has been easier to quilt since I turned on the AC. There was more moisture in the quilt than I realized.
The Shasta daisies are blooming. It is nice to see that the transplants are doing well.
I dug out some fabrics to audition them for the binding for the denim quilt.
Right now I am leaning toward one of these two
I has been hard to get my steps in lately. This morning at 6:15 the temp was 72, but the humidity was 74%. I hate the humidity. I hate it with a passion.
Ugh we were 100% humidity yesterday! Great progress on that denim quilt.
ReplyDeleteI like the narrow stripe in the second photo.
ReplyDeleteHumidity hasn't been horrible here yet but it going up today. I think I can get in one more session of weeding this early afternoon.
Motivation is really difficult with high humidity. It's starting to get miserable here this week too.
ReplyDeleteI like all the binding options! When I wish we had warmer weather I will remind myself about humidity.:-)
ReplyDelete