I got to work pin basting the log cabin quilt as soon as I got home from work.  We closed the office a bit early because it was very warm in the office.  We haven't had A/C for two weeks now and it was 82.  If the part comes in, it should get fixed next week.  Anyway, I got the quilt bin basted and have 7% of the quilting done.
I was having problems with the bobbin thread coming out of the bobbin slot.  I oiled the bobbin casing, changed the needle, and as a last resort tightened the bobbin case screw just a tiny bit.  We will see it the quilting goes smoother today.
That is the pits having A/C going out during a hot spell. I'm glad you could leave early. I hope you were able to correct the bobbin problem. I wonder if new bobbin cases are still available for our old machines.
ReplyDeleteIt's the pits having A/C go out in a heat spell.
ReplyDeleteI hope you solved the bobbin case problem. I wonder if new bobbin cases are still available for our old machines. I already have an extra I bought 20 years ago.
82?!?! Whew, I wouldn’t be able to work in heat like that……I’d be dripping sweat all over everything! The log cabin is quilting up beautifully:)
ReplyDeleteYou are moving right along with this quilt!
ReplyDelete